DOHA NORTH LAGOON 2 PROJECT

Client:
ASHGHAL/ KEPPEL SEGHERS
Location:
Qatar
Project Detail

4.5 km of 7 m High Concrete Retaining Wall. Grouting Works underneath the Wall for Water Seaage. 300,000 m³ Backfill Material on the Wall Including Geotextile 4.5 Km Road Works, 6,000 Drainage Pipes with Gravel Surround, 600 m of RCCP Pipes and Manholes, Overflow Structure & Inlets, Piezometric Walls