GTC499 REHABILITATION OF (60 SIX NOS. WELLFIELD STATIONS

Client:
KAHRAMAA/ SCHLUMBERGER
Location:
Qatar
Project Detail

Mobilization & Demobilization. Supply & Installations of Chain Link Fence around the Wellfield and site offices, wall head pumps, gate valves, flow meters, air release valve, sluice valve, strainer, HDPE Pipes & Fittings, chlorination system PLC, HVAC system, Fire Fighting System, Telecom system, Distribution boards, MCCB, electrical devices & switches, electrical equipment (Generator, /MV Panels, Transformer & DB’s), lighting fixtures, fire Alarm system, street lights, Earthing & lightning protection, Plumbing & Drainage System. Construction of concrete roads & concrete structures, new offices & control room, generator & MCC builders & tanker filling stations, concrete elevated tanks & supply & Installation of GRP Tanks, Septic Tank, wall head, soak away pit, valve chamber, wash out chamber, air valve chamber.