CONSTRUCTION OF EAST INDUSTRIAL ROAD PROJECT P17 BETWEEN AL MUNTAZAH ST. AND WEST CORRIDOR
Client:
ASHGHAL/ ALJABER ENGINEERING
Location:
Qatar
Project Detail
Construction of Viaduct Bridge (North & South) of 1.3km length consisting of 60,000 M³ of concrete, 11,000 ton of steel, Post-tensioning. Construction of two (2) Underground Pedestrian (2A = 90m & 37 = 160m).